Skip to content
JRC
The Lighting Solutions Company
Home
Line Card
Controls
Gallery
Education
Spotlight
Contact
JRCSTAT
ACUITY DISTRIBUTOR CENTER
Widget Menu
Linkedin page opens in new window
YouTube page opens in new window
Home
Line Card
Controls
Gallery
Education
Spotlight
Contact
Startup Request
Step
1
of
5
20%
Job Name
(Required)
Jobsite Address
(Required)
Startup Contact
(Required)
Email
(Required)
Phone Number
(Required)
PPE Requirements
Hard Hat
Safety Glasses
High Visibility Vest
Protective Footwear
Other Notes or Requirements
Is Your System Ready
Manufacturers will not be held liable for any damage caused by not following instructions.
Failure to adhere to these instructions and manufacturer’s instructions may void factory warranty.
If the following items are not complete, note reasons and expected completion date(s).
Checklist
All relays/dimmers installed, if applicable
All switches installed, if applicable
All sensors installed, if applicable
Correct cable used per Manufacturers recommendation, if applicable
All data connections wired per shop drawings &/or control schedule on plans and specifications
All terminations (data & line voltage) completed and verified
All dirt and debris removed from equipment
All equipment is accessible
Have all Manufacturer Specific System Installation Checklist(s) been completed?
Checklist(s) - Select All That Apply
Please send completed checklist(s) to
[email protected]
Fresco
LC&D/BlueBox
nLight Air
nLight Stand Alone
nLight Networked
EchoFlex
ETC
Lumenpulse
Nextlight
Other
Checklist Notes
(If checklist(s) have not been completed, note reason(s) below. Checklist(s)
must be completed
prior to startup.)
Programming/Startup Request
Allow for 2 weeks advance notice
prior to programming. Contact project manager at JRC Inc. to schedule programming/startup.
Only one
session will be conducted (unless otherwise negotiated.)
Return trips due to project not being ready for programming/startup
will result in additional charges.
I would like to schedule startup for: (1st Choice)
(Required)
MM slash DD slash YYYY
I would like to schedule startup for: (2nd Choice)
MM slash DD slash YYYY
Training Request
Allow for 2 weeks advance notice
prior to training. Contact your project manager at JRC Inc. to schedule training. Training can be provided the same day as programming if feasible.
Only one
session will be conducted (unless otherwise negotiated.) It is the responsibility of the installing contractor to ensure all appropriate people are invited to attend training.
Return trips due to project not being ready for training
will result in additional charges.
Training Request
I would like to schedule Training at the same time as startup.
Training at a later date.
Select Training Date
MM slash DD slash YYYY
Distributor
Phone
Electrical Contractor
Project Foreman
Phone
I hereby certify that all conditions have been met to proceed with startup and training and that the installation is complete, or will be complete, by the requested date above.
I also understand that additional charges will be incurred for additional site visits due to unprepared jobsite or lack of correct personnel available for training.
Signature
(Required)
Date
MM slash DD slash YYYY
Email
*** If you don’t receive an Automated response, please contact us to verify we received the startup request. ***
Go to Top